Tilton is the Lakes Region’s commercial front door — the I-93 exit, the Tanger Outlets corridor, and the Route 3 strip along the Winnipesaukee River. Alongside residential work, that means commercial site prep here: building pads, parking areas, stormwater systems, and utility trenches built to spec, compacted to spec, and documented for the engineer of record.
Commercial dirt work along the Exit 20 corridor plays by different rules than a camp driveway, and we treat it that way. Building pads go in with engineered fill placed in lifts and compaction-tested; parking areas get real stormwater design because impervious surface at this scale needs somewhere lawful to send its water; and everything starts with Dig Safe 811 plus a careful read of the utility plans, since the corridor’s underground is busy. The Winnipesaukee River defines the low side of town — sites near it can involve floodplain considerations and soils that have been filled and refilled since the mill era, so we test-pit before trusting any of it. Residential work continues alongside: foundation digs and drainage in the village and toward the Sanbornton line. Access is Tilton’s quiet advantage — highway proximity keeps material trucking cheaper than nearly anywhere else in the region.
Planning commercial work in Tilton’s corridor? Involve your excavation contractor while the civil plans are still in draft. Small changes to pad elevation or stormwater routing at the drawing stage — things an operator spots quickly — regularly save five figures in imported fill and rework once the design is stamped and the numbers are locked.

Foundations, pads, trenches, and grading — test pits first, flat quotes, on schedule.

Gravel driveways built with real base and crown — and washouts fixed for good.
Free site walks, test pits before quotes, flat pricing, and a crew that knows Lakes Region ground.
Tell us where the property is and what you’re trying to do. We’ll walk the site, talk it through, and give you a straight, flat quote.