New gravel driveways built with a real base, and tired ones regraded, crowned, and drained — so a Alton driveway survives mud season and the next big storm instead of washing down the hill.
The steep camp roads off Route 11 and around Alton Bay were laid out for Model A traffic in July, not tandem dump trucks in November — and that shapes every job we price here. Access is the first conversation: can a concrete truck make the grade, where do we turn equipment around, and is the road base solid enough to haul over at all? Come March and April, many of Alton’s town roads get posted for mud season, and hauling simply stops until they firm up, so we schedule around it rather than fight it. The conversion work itself is satisfying dirt work: lifting a camp, digging a full frost-depth foundation where posts used to be, trenching water and power, and cutting the driveway grade so it’s actually plowable. Up toward Mount Major, ledge sits close to the surface and a hydraulic hammer earns its keep.
Converting an Alton camp to year-round? Walk your camp road with your excavation contractor before you commit to a construction schedule. If the road can’t take loaded trucks — or gets posted every spring — your whole project timeline shifts, and it’s far better to plan a fall dig than discover a March standstill.
A driveway that lasts is a structure: geotextile where soils are soft, a compacted bank-run gravel base, and a crushed-gravel or stone surface crowned so water runs off the sides instead of down the middle. Culverts go where water crosses, ditches where it runs alongside. Skip any of those and you buy the same driveway again every few years — that’s the washboard, potholed, washed-out driveway we get called to fix.
We build new driveways, rebuild failing ones, and do the annual regrade-and-crown that keeps a camp road drivable through mud season.
New gravel driveways typically run $15–$30 per linear foot built right (base + surface + crowning); regrading and topping an existing driveway costs a fraction of that. Culverts and ditching quoted per site. Flat quote after a quick look.
Built properly — compacted bank-run base, crushed gravel surface, crowned — figure $15 to $30 per linear foot for a standard 12-foot-wide driveway, more on steep or soft ground. A cheap spread-and-go driveway costs less up front and every year after.
Water is running down it instead of off it. The fix is shape and drainage: crown the surface, ditch the uphill side, and put a culvert where water crosses. Once water has somewhere to go, the gravel stays where you paid for it.
Yes — washboard and potholes are symptoms of a thin or uncrowned surface. We regrade to pull material back where it belongs, re-crown, and compact. If the base has failed we'll tell you honestly and price a rebuild of just the failed section.
Free site walks, test pits before quotes, flat pricing, and a crew that knows Lakes Region ground.
Tell us where the property is and what you’re trying to do. We’ll walk the site, talk it through, and give you a straight, flat quote.